Name of project: Pembina River Bridge at Sangudo

Location: Rossington, Alberta

Completed: 2006

Summary:

The Pembina River bridge project provided rehabilitation of an existing four span (26.8m-33.5m-33.5m-26.8m) continuous steel girder bridge over Highway 18. Work included widening of existing abutments and piers, addition of two new girder lines, and replacement of the existing bridge deck with a wider deck.

The firm provided preliminary and detailed design, full-time resident inspection, and contract administration throughout construction.