Location: Edmonton, Alberta
The construction of a new five span (55m-70m-70m-70m-55m) steel girder bridge with a composite concrete deck provided a means to carry the Yellowhead highway over the North Saskatchewan River.
The firm provided preliminary and final design engineering, including preparation of contract documents, full time resident inspection, and contract administration during construction of the project.