Clover-Bar-Bridge-9_2

The construction of a new, five span (55m-70m-70m-70m-55m) steel girder bridge with a composite concrete deck provided a means to carry the Yellowhead Highway over the North Saskatchewan River.

BPTEC provided preliminary and final design engineering, including preparation of contract documents, full-time resident inspection, and contract administration during construction of the project.