Name of project: Dudley B. Menzies LRT Bridge

Location: Edmonton, Alberta

Completed: 1991

Summary:

The Dudley Menzies Bridge, which carries twin LRT tracks over the North Saskatchewan River, was the first segmental box girder bridge in Western Canada. The bridge uses a 600m long glued segmental precast superstructure with a pedestrian walkway suspended below.

The firm provided hydrotechnical assessment, preliminary and detailed design drawings, full-time resident inspection and contract administration. A detailed design for a steel alternate was also prepared.

The firm was awarded the American Concrete Institute Award for Design Excellence for their work on this project.