Location: Red Deer, Alberta Client: Lafarge
Cloverbar Bridge
Location: Edmonton, Alberta The construction of a new five span (55m-70m-70m-70m-55m) steel girder bridge with a composite concrete deck provided a means to carry the Yellowhead highway over the North Saskatchewan River. The firm provided preliminary and final design engineering, including preparation of contract documents, full time resident inspection, and contract administration during construction of the project.
Holy Trinity Catholic Church
Location: Stony Plain, Alberta Architect: HFKS Architects Ltd. Awards: 2002 NCWA Design Award of Excellence, 2003 Masonry Contractors Association of Alberta Award of Merit (Architectural Masonry Design General Category)
Beth Israel Synagogue
Location: Edmonton, Alberta Architect: Manasc Isaac Architects Ltd.
Fountain Park Recreation Centre
Location: St. Albert, Alberta Architect: Manasc Isaac Architects Ltd./Camrec Architectural Inc.
Elephant House
Location: Edmonton, Alberta Architect: Brinsmead Ziola Kennedy Architecture
Grey Nuns Parkade
Location: Edmonton, Alberta
Kinsmen Twin Arenas
Location: Edmonton, Alberta Architect: Barr Ryder Architects & Planners
Anthony Henday CNR Overpass
Location: Edmonton, Alberta The construction of a four span continuous steel girder structure carrying two CN mainline tracks over the then proposed Anthony Henday Drive in northwest Edmonton. A post-tensioned concrete slab superstructure was also designed for this project.
Calmont Truck Leasing
Location: Edmonton, Alberta Architect: ACI Architecture Inc.